Conserva Irrigation β€” Contractor Job
β€”
πŸ“… Scheduled
Install Address
β€”
Install Date
β€”
Start Time
7:30 AM sharp
Foreman On-Site
Michael Kansler
Scope
β€”
πŸ—ΊοΈ Zone Layout Plan
🏠 Zone 1 β€” Front Lawn Zone 2 Right Side Zone 3 β€” Back Lawn Zone 4 Beds/Drip VALVE Rotor (front) Rotor (back) Spray Valve box
Zone 1 β€” Front Lawn
Hunter PGP rotor Β· 8 heads Β· 18 min run time
8 heads
Zone 2 β€” Right Side
Hunter Pro spray Β· 4 heads Β· 12 min run time
4 heads
Zone 3 β€” Back Lawn
Hunter PGP rotor Β· 9 heads Β· 20 min run time
9 heads
Zone 4 β€” Planting Beds
Drip line Β· 25 min run time
drip
πŸ“‹ Scope of Work
1
Trench all pipe runs per zone plan
6" depth min Β· approx 320 linear feet Β· 4 zones
2
Install heads at positions shown on plan
21 total β€” rotors flush with lawn grade
3
Install valve manifold at marked location
Left side of house near water meter β€” see VALVE marker on plan
4
Run control wire to controller location
Controller mounted in garage β€” pre-drilled entry point marked with orange flag
5
Close all trenches and clean site
Tamp all disturbed areas β€” zero debris or pipe scraps left on site
⚠️ Special Notes β€” Read Before Starting
β€’ Dog in backyard β€” gate code is #1234. Keep gate closed at all times.
β€’ Customer wants heads flush with lawn β€” Zone 1 especially.
β€’ Large tree root on east side near Zone 2 β€” route pipe around it, do not cut.
β€’ No work on Fridays per customer request.
β€’ Foreman (Michael Kansler) arrives Day 1 at 2:00 PM for backflow install.
πŸ“Έ Required Job Photos

All 4 stages required before sign-off is available.

Pre-Install (before work begins)
Required Β· 2+ photos of site
Trenches Open
Required Β· show all zones
Heads Installed
Required Β· 1 photo per zone minimum
Site Clean β€” Job Complete
Required Β· full property front and back

βœ… Digital Sign-Off

Check all items, note any field deviations, then submit. Conserva will be notified immediately.

βœ“
All zones installed per the plan
βœ“
All trenches closed and tamped
βœ“
Site fully cleaned β€” no debris left
βœ“
All 4 required photo stages uploaded
βœ“
Any deviations noted below